IRS-100-ULT3 Railway Surveillance System
Page 21
Figure 3-8: HDD/SSD Retention Screws
Step 4:
Carefully insert the HDD/SSD tray into the slot on the front panel (
).
Make sure the SATA connector on the HDD/SSD is securely connected to the
SATA connector inside the chassis.
Figure 3-9: Installing the HDD/SSD Tray
Step 5:
Lock the HDD/SSD trays (
Step 0:
Figure 3-10: Locking the HDD/SSD Trays
Summary of Contents for IRS-100-ULT3
Page 14: ...IRS 100 ULT3 Railway Surveillance System Page 1 Chapter 1 1 Introduction ...
Page 21: ...IRS 100 ULT3 Railway Surveillance System Page 8 Chapter 2 2 Unpacking ...
Page 25: ...IRS 100 ULT3 Railway Surveillance System Page 12 Chapter 3 3 Installation ...
Page 48: ...IRS 100 ULT3 Railway Surveillance System Page 35 Chapter 4 4 BIOS ...
Page 80: ...IRS 100 ULT3 Railway Surveillance System Page 67 Chapter 5 5 Maintenance ...
Page 84: ...IRS 100 ULT3 Railway Surveillance System Page 71 Chapter 6 6 Interface Connectors ...
Page 94: ...IRS 100 ULT3 Railway Surveillance System Page 81 Appendix A A Regulatory Compliance ...
Page 98: ...IRS 100 ULT3 Railway Surveillance System Page 85 Appendix B B Safety Precautions ...
Page 103: ...IRS 100 ULT3 Railway Surveillance System Page 90 Appendix C C Watchdog Timer ...
Page 106: ...IRS 100 ULT3 Railway Surveillance System Page 93 Appendix D D Hazardous Materials Disclosure ...