ZSSC4151Evaluation Kit Start-Up Guide
© 2016 Integrated Device Technology, Inc.
11
March 11, 2016
3.2.
Checking the Calibration
The calibration can be checked in the “Main” tab.
1. Click the “Start” button in this window and observe the reading to verify readings. If the red knob of the
Sensor Replacement Board has been left in the fully clockwise position as in step 5 in section 3.1, the
calibration at the “P2” calibration point can be verified by checking that the output for “Pressure” is 90%.
2. Similarly, if the red knob is turned fully counterclockwise, the reading should be 10%.
3.3.
Saving the NVM Data and GUI Configuration Settings
The GUI settings and NVM contents for this example can be saved to new configuration and NVM dump files.
Select
FILE > Save GUI Configuration
from the top menu, and save the configuration under a new name. In a
similar way, the NVM dump file can be saved using
FILE > Save NVM Dump
and creating a new name.
4
Related Documents and Tools
4.1.
IDT Related Documents and Tools
Document
ZSSC4151 Data Sheet
ZSSC4151 Feature Sheet
ZSSC415x Graphical User Interface Operation Manual
ZSSC4151 SSC Evaluation Kit Hardware Manual
or contact your nearest sales office for the latest
version of these documents.
5
Glossary
Term
Description
DUT
Device Under Test
GUI
Graphical User Interface
NVM
Nonvolatile Memory
OWI
One-Wire Interface
SSC
Sensor Signal Conditioner
USB
Universal Serial Bus