(C) IDM ENERGIESYSTEME GMBH
Installation TERRA S/W
37
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
60
190
1 1/4”
connection pipes
to heat pump
on site!
PE-pipe Ø 25
manifold length L
connection set
Heat source
H
e
a
t sour
ce
5.2. Connection diagram
Technical data surface collector
Type FKS
Unit
1
3
4
5
6
7
7A
8
9
11
13
15
18
Number of pipe circuits
1
3
4
5
6
7
7
8
9
11
13
15
18
Total pipe length
m
200 300 400 500 600
700
700
800
900
1100 1300 1500 1800
Surface requirement
m²
160 240 320 400 480
560
560
640
720
880
1040 1200 1440
Connection line Ø
mm
32
32
40
40
40
50
50
50
50
65
65
65
73
Brine circulation pump
25/7 25/7 25/7 25/7 25/7 25-80 32-80 32-80 32-80 40/10 40/10 50/10 50/10
Distributor length
mm
-
180 240 300 360
420
420
480
540
660
780
900
1080
Brine mix*
l
120 105 140 175 210
245
245
280 315
385
455
525
630
* Brine mix (30% antifreeze proportion), without con-
tent of the manifold
The identifi ed surface requirement for geothermal
pumps is based on average soil conditions (soil,
loam). In the case of poor soil (stony), the required line
length, therefore also the surface, should be enlarged
and the pipes should be embedded in fi ne-grained
sand (cable sand 0.3 to 0.5 mm).
Contact your IDM partner for more information.
Note
- The installation should take place several months
before the heating period. Corresponding prepara-
tion times need to be taken into account during the
overall planning process.
- Plants with deep-growing root structures must be
avoided in all cases.
- Rainwater must not be diverted using drainage as it
is required to regenerate the ground.
- When back-fi lling, a signal band of approx. 0.5
above the pipeline should be laid to avoid subse-
quent damage.
- In the case of surface collectors, the overlying sur-
face must not be closed off (e.g. by asphalting).