Page 8 of 12
0900885 Rev: REL (02/06)
MANIFOLD INSTALLATION (OPTIONAL)
(1) Determine the vertical mounting configuration desired for the application (top and bottom orientation). This is
particularly important for dual manifold applications.
(2) Attach the input (elbow) and output (straight) barb fittings included in accy kit.
(3) A checkvalve is included in the accy kit that will function as a vacuum break. Attach this checkvalve to the top
port of the manifold. This will leave 7 ports remaining for chemical pumps.
(4) Plugs should be installed in any of the unused ports of the manifold.
(5) Mount manifold to wall using appropriate hardware.
(6) Connect tubing from pumps to inlet port barb fittings using hose clamps to secure connections.
(7) Connect the inlet fitting to the appropriate water flush solenoid in the control box. This is particularly important for
dual manifold applications.
(8) Connect the outlet fitting to bucket fill spout (or hose) or other point of discharge.
(9) Put the cover on the manifold and secure in place with provided screws.
►
Installation Example