4.

 

Installation & Maintenance 

Principle 

The UGB-NET switch is mounted to the fixed frame of the guard or machine, the handle and actuator are 
fitted to the moving guard with the actuator tongue aligned to the aperture of the switch head. The 
mechanical tongue actuator profile is designed to match a cam mechanism within the switch head, the 
cam and tongue together realise the specified holding force. 

 

WARNING 

DO NOT DEFEAT, TAMPER, OR BYPASS THE SAFETY FUNCTION.  
FAILURE TO DO SO CAN RESULT IN DEATH OR SERIOUS INJURY. 
 
NE PAS DESACTIVER, MODIFIER, RETIRER, OU CONTOURNER CETI, INTERVERROUILLAGE 
IL PEUT EN RESULTER DES BLESSURES GRAVES DU PERSONNEL UTILISATEUR. 
 

 

Observe the county-specific regulations when installing the device. 

 

Repair or modification of the UGB-NET is not allowed unless authorised by IDEM 
and carried out according to operating guidelines. 

 

Safety critical failures which do not lead to the safe state shall be reported to IDEM 
immediately. 

 

Replace a malfunctioning UGB-NET immediately. 

 

IMPORTANT 

 

Ensure that the static forces applied during normal operation do not exceed the 
holding force (Fzh). 

 

Ensure that dynamic forces acting on the switch caused by bouncing of the guard do 
not create an impact reaction force which exceeds the holding force (Fzh).  
 

NOTES REGARDING  

  : 

 

Maximum Temperature 40°C 

Fastening 

 

IMPORTANT 

 

If fitting rotary or sliding handles ensure the M6 mounting bolts are used to fix the 
appropriate mounting plates. 

 

The tightening torque to ensure reliable fixing is 4.0Nm. 

 

The front and rear rotary handles can be adjusted for desired position by loosening 
the locking bolt which fixes the handle to the switch body. 

Maintenance Activities 

 

IMPORTANT 

 

To achieve the target safety level, it is required to routinely check the safety 
functions are operating correctly. For applications targeting PLe a check should take 
place once per month, for PLd applications a check should take place once per year. 

 

If any part of the UGB-NET displays mechanical damage then remove and replace. 

 

IDEM will not accept responsibility for failure of the switch functions if the 
installation and maintenance requirements shown in this document are not 
implemented.  

Summary of Contents for UGB-NET-CS

Page 1: ...nstructions To request this document in other languages please contact info idemsafety com IDEM Safety Switches UGB NET CS RFID Guard Interlock with Integrated EtherNet IP with CIP Safety Operating In...

Page 2: ...andle 3 UGB NET with Sliding Handle 3 5 Electrical Connection 4 6 Protocol Setup 5 Network Address Setup Initial Setting 6 Setting via DIP Switch 6 Setting via DHCP 6 Studio 5000 Ethernet IP Configura...

Page 3: ...es are not in a position to guarantee all of the characteristics of a given system or product not design by IDEM All relevant safety regulations and standards are to be observed The UGB NET CS complie...

Page 4: ...to IDEM immediately Replace a malfunctioning UGB NET immediately IMPORTANT Ensure that the static forces applied during normal operation do not exceed the holding force Fzh Ensure that dynamic forces...

Page 5: ...erating Instructions IDEM Safety Switches UGB NET CS 102620 2210 UGB NET CS Operating Instructions 3 UGB NET with Rotary Handle Guard Front Guard Rear UGB NET with Sliding Handle Guard Front Guard Rea...

Page 6: ...ments for UL a class 2 power supply must be used INFORMATION When multiple devices are used in a daisy chain arrangement the power bus may be forwarded via the UGB NET device Please see technical spec...

Page 7: ...e shall assume an ASYNC parameter value of 1 Configuring an originator with connection data and or target configuration data must be downloaded to the target so it can be tested and verified Only then...

Page 8: ...ccess to the DIP switches 2 Using a small tool push the required switches to the ON position to set the corresponding bit 3 Cycle power to the UGB NET or press and hold the reset button until the LEDs...

Page 9: ...ick OK 5 Open an internet browser and type in the IP address of the UGB NET 6 Navigate to Configuration under the NETWORK menu 7 Set DHCP to Disabled and click Save settings 8 Cycle power to the UGB N...

Page 10: ...onfiguration 1 Download the EDS file for the UGB NET and import to application control software 2 Open or create a project with the PLC CPU Partner and Ethernet IP modules added 3 Right click the Ethe...

Page 11: ...customisable UGB_NET_CIP used as example only and set the previously configured IP address 6 Change the Safety Network Number SNN to match that of the controller PLC 7 On the Safety tab uncheck the Co...

Page 12: ...assistance please contact technical idemsafety com Functional Tests Once the device has been installed and setup within the EtherNet IP CIP Safety application control software the following checks are...

Page 13: ...d open reset required Red Green alternate Reset in progress DS Green Device running Red Internal fault detected MS Green Connection to PLC Run state Green Flash Connection to PLC Idle state Red Major...

Page 14: ...must be used Current consumption max 600 mA Lock solenoid enabled Allowed through current daisy chain 5 A Mechanical Data Maximum holding force F1 3000 N Rated holding force Fzh 2307 N Body material D...

Page 15: ...Operating Instructions IDEM Safety Switches UGB NET CS 102620 2210 UGB NET CS Operating Instructions 13 NOTES...

Page 16: ...NET THE LISTED DEVICES CONFORM TO THE ESSENTIAL HEALTH AND SAFETY REQUIREMENTS OF THE FOLLOWING EUROPEAN DIRECTIVES AND STANDARDS DIRECTIVES Machinery Directive 2006 42 EC EMC Directive 2014 30 EU ST...

Reviews: