8
Viscount GTS -
Installation & Servicing
INSTALLATION
C
1080mm
200mm
H*
D
Heating return:
- 14 to 17 sections : 139.7 - 5"
- 18 to 25 sections : 159 - 6"
requires welding
Draining outlet
3/4" tap
Heating outlet:
- 14 to 17 sections : 139.7 - 5"
- 18 to 25 sections : 159 - 6"
requires welding
* dimension without connection
(see figure on page 5,
connection 1 or 2)
VIS9132
GTS
14
15
16
17
18
19
20
21
22
23
24
25
C (mm)
1488
1488
1488
1488
1504
1504
1504
1504
1504
1504
1504
1504
D (mm)
217
188
189
210
236
257
208
209
230
231
252
253
H (mm)
-2
-31
-30
-9
-8
13
-36
-35
-14
-13
8
9
4
HYDRAULIC CONNECTIONS
Dimensional Information Required
3
Ventilation
The ventilation shall comply with applicable regulations,
particularly codes of practice.
Detailed recommendations for air supply are quoted in B.S.
6644.
Please note :
remember that boilers installed in or close to
rooms in which the atmosphere is polluted with chlorine or
fluorine compounds may be subject to high corrosion.
For example : hairdressing salons, industrial premises
(solvents), cooling equipment, etc.
Boiler installed in such locations shall not be covered by the
warranty.
INST
ALLA
TION