Installation & Servicing
INSTALLATION
•
Put the baffle plates into place in the upper front flue ways,
taking
care to interlock them with each other before fitting them.
25 ASSEMBLING THE FLUE CLEANOUT COVERS
•
Clean off the protective varnish on the ground surfaces with solvent.
•
The covers are numbered from 1 to 4, and must be fitted with a thermocord (1).
The length of the thermocord depends upon the cover and is given below.
Type
Thermocord Length
1
1335 mm
2
1110 mm
3
890 mm
4
665 mm
Cover Model
No 1
No 2
No 3
No 4
Type of
Boiler
FRONT
REAR
GTS 14
2
6
GTS 15
2
4
2
GTS 16
2
4
2
GTS 17
2
6
GTS 18
2
2
6
GTS 19
2
6
2
GTS 20
2
6
2
GTS 21
2
8
GTS 22
2
6
2
2
GTS 23
2
6
4
GTS 24
2
8
2
GTS 25
2
10
Number of sweeping covers per type
•
Place the two no. 1 cleanout covers (with the handles
turned outward) on either side of the boiler starting from
the front. Distribute the other covers evenly.
Each cover is fitted with a system whereby it can only be
mounted with the handles turned outward.
•
Fit the two locks of each cover between the sections.
•
Push the cover towards the outside of the boiler, to the
“closed” position (1).
•
Fasten the two brass nuts of each cover (4).
1
2
3
4
VIS5081
Handles turned
outward
REAR
FRONT
19
24 ASSEMBLING THE BAFFLE PLATES
Boiler
GTS 14
GTS 15-19
GTS 20-25
Total number
of baffle
4
6
8
plates
Package no.
CM23
CM22 + CM23
2xCM23
INST
ALLA