16
Viscount GTS -
Installation & Servicing
INSTALLATION
•
On the lower assembly rods, fit the following at each
end in the given order : an expansion spring, a washer
and a nut (the holes of the front lugs must be aligned
with the holes of the frame brackets as the assembly
rods are used to make the boiler body integral with the
frame).
•
Stop tightening as soon as the gap between the
spring spires is equal to about 2 mm.
•
Put in place the upper assembly rods in the two front
and rear lugs.
•
Mount the two crosspieces (supplied in package
IG84
/
IG85)
with their bends turned backwards and fasten
them to the rods with an expansion spring, a nut and a
washer.
•
Remove the assembly tool.
2
mm
VIS5073
2mm
2mm
VIS5074
REAR
FRONT
15 FITTING THE UPPER AND LOWER ASSEMBLY RODS
16 FITTING THE UPPER AND LOWER ASSEMBLY RODS
INST
ALLA
TION