16
INsTaLLaTION
Ideal Logic Combi -
Installation and Servicing
FLUE
OUTLET
FLUE KITs
Pack B
- supplied as standard
Pack B
- optional telescopic
Pack D
- optional extension kit for side flue or rear flue outlet.
Concentric Flue Retaining Kit -
Optional Kit for mechanical fixing
of flue joints
Finishing Kit
- Supplied as an optional extra.
Refer to ‘Flue Extension Ducts’
IMPORTaNT.
The boiler MUST be installed in a vertical position
Dimension x
- Wall thickness.
Dimension L
- Wall thickness plus boiler spacing.
Dimension s
- Optional stand-off Frame depth 45mm.
10 DETERMINING ThE FLUE LENGTh aND FLUE PaCKs REqUIRED
Note. MaxiMuM Flue lengThs:
24
- 9M (horizonTal Flue)
30
- 8M (horizonTal Flue)
35
- 6M (horizonTal Flue)
24, 30 35
- 7.5M (rooF Flue)
24, 30 & 35
- 5M PriMarY anD 17M seConDarY is a TYPiCal Max.
Flue lengTh. (For alternative details refer to Powered Vertical Instructions)
90
o
Elbow KIt 60/100 (EquIValEnt FluE lEngth rEsIstancE = 1m)
45
o
Elbow KIt 60/100 (EquIValEnt FluE lEngth rEsIstancE = 0.6m)
mInImum horIzontal FluE lEngths - tElEscoPIc tErmInal = 350mm
(Centre line of turret to outside of wall terminal)
- onE PIEcE tErmInal = 285mm
197mm 197mm
Wall Thickness X
Side flue length L
155 mm
155 + S = 200mm
3G9493
sIDE FLUE
REaR FLUE
197mm 197mm
Wall Thickness X
Side flue length L
155 mm
155 + S = 200mm
3G9493
continued . . . . .
204626-8.indd 16
25/08/2011 13:15:40
Summary of Contents for LOGIC+ Combi 24
Page 2: ...2 Ideal Logic Combi Installation and Servicing...
Page 61: ......