13
icos
-
Installation & Servicing
GENERAL
Safety valve setting
3.0 bar
2.5 bar
2.0 bar
Vessel charge and initial
0.5
1.0
1.5
0.5
1.0
1.5
0.5
1.0
system pressure
bar
bar
bar
bar
bar
bar
bar
bar
Total water content of system
Expansion vessel volume litres
litres
25
2.1
2.7
3.9
2.3
3.3
5.9
2.8
5.0
50
4.2
5.4
7.8
4.7
6.7
11.8
5.6
10.0
75
6.3
8.2
11.7
7.0
10.0
17.7
8.4
15.0
100
8.3
10.9
15.6
9.4
13.4
23.7
11.3
20.0
125
10.4
13.6
19.5
11.7
16.7
29.6
14.1
25.0
150
12.5
16.3
23.4
14.1
20.1
35.5
16.9
30.0
175
14.6
19.1
27.3
16.4
23.4
41.4
19.7
35.0
200
16.7
21.8
31.2
18.8
26.8
47.4
22.6
40.0
225
18.7
24.5
35.1
21.1
30.1
53.3
25.4
45.0
250
20.8
27.2
39.0
23.5
33.5
59.2
28.2
50.0
275
22.9
30.0
42.9
25.8
36.8
65.1
31.0
55.0
300
25.0
32.7
46.8
28.2
40.2
71.1
33.9
60.0
Multiplying factors for
other system volumes
0.0833
0.109
0.156
0.094
0.134
0.237
0.113
0.20
8
SEALED SYSTEM REQUIREMENTS - continued
9
WATER TREATMENT
The icos boiler range have an ALUMINIUM alloy heat exchanger
IMPORTANT.
The application of any other treatment to this product may render the guarantee of Ideal
Stelrad Group invalid.
Ideal Stelrad Group
recommend water treatment in accordance with the
Benchmark
Guidance Notes on Water
Treatment in Central Heating systems.
Ideal Stelrad Group
recommend the use of FERNOX-COPAL or MB1 or GE Betz Sentinel X100 inhibitors and
associated water treatment, which must be used in accordance with the manufacturers' instructions. For further
information contact:
Notes
1.
It is most important that the correct concentration of the water
treatment product is maintained in accordance with the
manufacturers' instructions.
2.
If the boiler is installed in an existing system any unsuitable
additives MUST be removed by thorough cleansing.
BS. 7593:2006 details the steps necessary to clean a
domestic central heating system.
3.
In hard water areas, treatment to prevent lime scale
may be necessary - however, the use of artificially
softened water is NOT permitted.
4.
Under no circumstances should the boiler be fired
before the system has been thoroughly flushed.
Sentinel Performance Solutions
The Heath Business & Technical Park
Runcorn
Cheshire
WA7 4QX
Tel: 0800 389 4670
www.sentinel-solutions.net
Fernox Manufacturing Co. Ltd
Cookson Electronics
Forsyth Road
Sheerwater
Woking
Surrey
GU21 5RZ
Tel: +44 (0) 1799 521133
Salamander Engineering Ltd
The Heath Business &
Technical Park
Runcorn
Cheshire
WA7 4QX
Tel: +44 (0) 121 3780952
Summary of Contents for HE12
Page 2: ...2 icos Installation Servicing...
Page 54: ...54 icos Installation Servicing NOTES...
Page 55: ...55 icos Installation Servicing NOTES...
Page 56: ......
Page 58: ...Gas Safe Register ID Number...