35
icos
-
Installation & Servicing
SERVICING
44 SERVICING SCHEDULE
45 BOILER FRONT PANEL REMOVAL
46 BOILER SEALING PANEL/
BOTTOM PANEL REMOVAL
1.
Remove the 2 screws from the underside of the
appliance.
2.
Pull the front panel forward at the bottom and lift
to disengage it from the top lugs.
1.
To remove the sealing panel remove the 4 screws.
2.
Remove the panel.
3.
To remove the bottom panel remove the 2 screws.
4.
Pull the RH side of the panel down. Slide it to the right
and withdraw.
nm7808
For the very latest copy of literature for specification and maintenance practices visit our website www.idealboilers.com,
where you will be able to download relevant information. N.B. Technical Bulletins are also available on our website.
WARNING.
Always turn OFF the gas supply at the gas service cock, and switch OFF and disconnect the electricity
supply to the appliance before servicing.
The servicing procedures are covered more fully in Frames
44-51 and MUST be carried out in sequence.
Note.
In order to carry out either servicing or replacement of
components the boiler front panel and sealing panel
must be removed. Refer to Frames 45 and 46.
IMPORTANT.
8.
After completing the servicing or exchange of components
always test for gas tightness.
9.
When work is complete the sealing panel MUST be
correctly refitted, ensuring that a good seal is made.
Do NOT OPERATE the boiler if the sealing
panel is not fitted.
10.
If, for any reason, the condensate ‘S’ trap has been
removed ensure the trap is refilled with water before
reassembling.
11.
Check the gas consumption.
12.
Connect a suitable gas analyser to the sampling point on
the top of the boiler (refer to Frame 45) or into the flue
terminal if access is possible (optional test).
For correct boiler operation, the CO/CO
2
content of the flue
gas should not be greater than 0.004 ratio.
13.
Complete the service section in the Benchmark
Commissioning Checklist.
To ensure the continued safe and efficient operation of the
appliance it is recommended that it is checked at regular
intervals and serviced as necessary. The frequency of
servicing will depend upon the installation condition and
usage but should be carried out at least annually.
It is the law that any service work must be carried out by a
Gas Safe Registered Engineer. In IE service work must be
carried out by a Registered Gas Installer (RGII).
1.
Light the boiler and carry out a pre-service check, noting
any operational faults.
2.
Clean the main burner.
3.
Clean the heat exchanger & ‘S’ trap.
4.
Check the condition of the combustion chamber insulation.
Any cracked, damaged or displaced pieces should be
replaced.
Ionisation probes are a serviceable component and require
annual inspection and replacement if distorted.
5.
Check the main injector for blockage or damage.
6.
Wherever possible remove and clean the condensate ‘S’
trap (refer to Frame 44) and check the drain for blockage.
7.
Check that the flue terminal is unobstructed and that the
flue system is sealed correctly.
SER
VICING
Summary of Contents for HE12
Page 2: ...2 icos Installation Servicing...
Page 54: ...54 icos Installation Servicing NOTES...
Page 55: ...55 icos Installation Servicing NOTES...
Page 56: ......
Page 58: ...Gas Safe Register ID Number...