15
xtra
-
Installation & Servicing
INSTALLATION
11.
Remove 4 screws on each rear gas pipe support
channel and discard channels.
16.
Fit Slave inner fascia panel to Slave Module securing with 2
x M5 screws whilst re-fitting ribbon cable to display board.
12.
Replace with the one piece rear gas pipe support channel and
secure with 6 screws (located in casing assembly pack).
15.
Fit master fascia panel securing with 2 x M4
screws. Ensure ribbon cable is re-fitted.
14.
Place top panel onto both modules and
secure at rear with 2 x M5 screws
(supplied).
13.
Tie support the thermistor harnesses on each boiler
module. The thermistor harness is located towards the rear
of each boiler module. Using the 4 tie wraps supplied in the
casing assembly pack, tie the harnesses to the 4 holes
located on the inside face of the rear support channel.
11 ASSEMBLING THE MODULES .... CONTINUED
INST
ALLA
TION