3
EVOMAX
-
Installation & Servicing
GEnERAL
ContEntS
boiler Assembly - Exploded view
.
...................................9
boiler Clearances
.
.............................................................7
Commissioning and testing
.
..........................................40
Electrical Connections
.
...................................................25
Electrical Supply
.
...............................................................6
fault finding
. ...................................................................
51
flue Installation
.
................................................................5
flue kits
.
..........................................................................13
Gas Safety Regulations
...................................................
4
Gas Supply
.
........................................................................5
Hydraulic Resistance
.
.......................................................6
Introduction
.
.......................................................................4
Initial Lighting
.
.................................................................41
Installer Connections
.
.....................................................26
Installation
.
.........................................................................9
mounting boiler
.
..............................................................12
option kits
.
........................................................................4
Performance Data
.
.............................................................2
Servicing
. .........................................................................
43
Short List of Parts
. ..........................................................
61
Ventilation
.
.......................................................................12
Water Circulation
.
..............................................................5
Water Connections
.
.........................................................24
Water System Requirements
.
...........................................8
Water treatment
.
...............................................................6
Wiring Diagrams
.
.............................................................27
CAutIon.
to avoid the possibility of injury during the installation, servicing or cleaning of this
appliance, care should be taken when handling edges of sheet steel components.
key to symbols
IE
= Ireland, GB = United Kingdom (Countries of destination)
PMS =
Maximum operating pressure of water
C13 C33 =
A room sealed appliance designed for
connection via ducts to a horizontal or vertical
terminal, which admits fresh air to the burner
and discharges the products of combustion
to the outside through orifices which, in this
case, are concentric. The fan is up stream of
the combustion chamber.
C63 =
A room sealed appliance intended to be
connected to a separately approved and
marketed system for the supply of combustion
air and discharge of combustion products.
The fan is up stream of the combustion
chamber.
B23 =
An appliance intended to be connected
to a flue which evacuates the products
of combustion to the outside of the room
containing the boiler. The combustion air is
drawn directly from the room. The fan is up
stream of the combustion chamber.
II2H3P =
An appliance designed for use on 2nd and 3rd
Family gases.
EVomAX
30, 40, 60, 80, 100, 120, & 150
30P, 40P, 60P & 80P
Natural Gas & LPG
Destination Countries: GB, IE
boiler size
G.C. Appliance no.
PI no.
(benchmark no.)
30
41-750-33A 86-CL-166
40
41-750-34A 86-CL-166
60
41-750-35A 86-CL-166
80
41-750-36A 86-CL-166
100
41-750-37A 86-CL-166
120
41-750-38A 86-CL-166
150
41-750-39A 86-CL-166
30P
41-750-40 86-CL-166
40P
41-750-41 86-CL-166
60P
41-750-42 86-CL-166
80P
41-750-43 86-CL-166
206210-3.indd 3
09/06/2011 13:34:04