![ideal commercial VICEROY GTS 8 Installation And Servicing Download Page 14](http://html1.mh-extra.com/html/ideal-commercial/viceroy-gts-8/viceroy-gts-8_installation-and-servicing_3667812014.webp)
14
Viceroy GTS -
Installation & Servicing
INSTALLATION
vic91
12
2
2
3
M 12
M 12
vic7088
14 PREPARING THE BASE FRAME AND FITTING THE BASE INSULATION
1.
Remove the nuts and bolts holding the base
frame components in their packed form.
2.
Locate the crossmembers under the longtitudal
members.
3.
Secure the cross member with the nuts, bolts
and two washers.
4.
Fit the 2 rear attachment brackets (in the body
accessories pack) and attach them onto the
framework using two M12 x 40 bolts, four
washers and two nuts.
Caution: use the corresponding holes
according to the indications on the framework.
5.
Put the lower insulation in place (fabric to top)
packs IE 51 to IE 57. Adapt length if necessary
or fold the lower insulation after the casing has
been completely assembled.
15 POSITIONING THE REAR SECTION
1.
Determine the required location of the
framework depending on the direction in which
the burner door will be opened and the length
of the burner.
2.
Place the rear section on the framework and
support it with a wooden block. Attach it at
the brackets using two M12 x 40 bolts, four
washers and two nuts.
3.
Carefully inject a drop of silicone mastic
approximately every 100mm and put the
thermocord in place (body accessories pack)
in the sealing groove and cut to the correct
length.
Note.
Do not pull on the cord when it is being put in, to
avoid stretching and to preserve its thickness.
vic9
113
5
4
GTS 8, 10, 12, 14
GTS 9, 11, 13
vic9114
INST
ALLA
TION