11
Mexico Super 100 FF & 125 FF -
Installation
INSTALLATION
INST
ALLA
TION
FLUE KITS
Pack B:
supplied as standard.
Pack D:
optional extension kit for side
flue, top or rear flue outlet. Refer to 'Flue
Extension Ducts'
1.
A maximum of 2 extension ducts (plus
the standard flue duct) may be used
together for 100 FF or 1 extension
duct for 125 FF.
2.
Flue extensions of greater than 1m
(39") should be supported with the
bracket provided.
It is MOST IMPORTANT that the boiler is installed in a vertical position.
7
DETERMINING THE FLUE LENGTH
6
BOILER CASING REMOVAL - continued
5.
Remove the 2 screws securing the control panel and pull down
to release the tabs from under the top panel.
6.
Remove the 2 screws securing the top panel to the side.
7.
Draw the top panel forward and lift it off the boiler.
8.
Remove the 2 screws securing the LH side panel to the turret
front panel and baseplate.
9.
Pull the panel forward, disengaging from the collector hood
tab, lifting it clear of the locating peg and remove.
10.
Repeat steps 8 and 9 to remove the RH panel.
11.
The boiler is held to the packaging base by 4 M6
hex head screws. Remove the front screws, slacken
the rear screws and remove the boiler from the
packaging base.
Flue length mm
100 FF Pack Req.
125 FF Pack Req.
Product No.
Up to 600
B, 1 off
B, 1 off
152 227
600 to 1000
B, 1 off + D, 1 off
B, 1 off + D, 1 off
152132
600 to 1550
B, 1 off + D, 1 off
N/A
152 227+
152132, 1 off
1505 to 2000
B, 1 off + D, 2 off
N/A
152 227+
152132, 2 off
WARNING.
For top outlet installation (100 FF only)
the flue terminal MUST always be in
the horizontal position.
Top outlet flue length
= A + B + Elbow allowance
90
o
Elbow = 1m
45
o
Elbow = 0.7m