11
Concord CXD -
Installation
JACKET PACK contains
z
Front panel ........................ 1 off
z
Side panel ......................... 2 off
z
Top panel .......................... 1 off
z
Flue brush ......................... 1 off
z
Jacket hardware pack ....... 1 off
INSTALLATION HARDWARE PACK contains
z
M10 washer ....................................... 4 off
z
Split pin .............................................. 1 off
z
Strain relief bush ................................ 1 off
z
M10 x 25 Hex. Hd. screw ................... 2 off
z
M10 x 35 Hex. Hd. screw ................... 2 off
z
Gasket EPDM Type EP600 ............... 3 off
z
Plug 2" taper Sq. Hd .......................... 3 off
z
Inst/Service instructions ..................... 1 off
z
User's instructions .............................. 1 off
z
Flange RC 1" ..................................... 1 off
z
2" BSP Flange (distributor tube) ........ 1 off
z
2" Installation pipe (handling bars) .... 2 off
z
Thermostat pockets ........................... 2 off
1.
Remove the jacket carton and outer packaging frame.
2.
Remove the jacket pack support frame.
3.
Remove the distributor tube pack, controls package and
installation pack.
4.
Remove the 2" BSP steel handling bars from installation
pack.
5.
Remove 4 base bolts holding assembly to the packaging
base.
6.
Remove the wood screws securing the front cross
member on the packaging base.
7.
Remove the gas cock by unscrewing the union and screw
in the handling bars into the 2 front tappings. Protect the
exposed inlet gas union from ingress of dirt.
8.
Knock out front spacing blocks from the packaging base,
ensuring that the boiler assembly is supported, using 2" BSP
handling bars.
9.
Using the handling bars, manoeuvre the boiler forward on
the packaging base and slide over collapsing base on to the
floor.
Note.
Before manoeuvring the boiler into its final position see
Frame
8
INSTALLATION
INST
ALLA
TION
6
PACKAGING
Check that all these packages are complete and have been
correctly received on site.
Factory assembled boilers are despatched from the works as
fully packaged units comprising:
1.
Assembled boiler body (with distributor tube) on a wooden
pallet base enclosed in a wooden crate.
2.
Carton containing the casing, fastenings and flue brush.
3.
Carton containing the installation pack and instruction
books.
4.
Carton containing the control box.
7
PACKAGING AND BOILER REMOVAL