GENERAL
6
Buccaneer GT Range
- Installation
INSTALLATION RECOMMENDATIONS
The installation of the boiler MUST be in accordance with the
following British Standards and Codes of Practice:
BS. 799 Pts. 4,5,6 & 7 Oil Burning Equipment
BS. 5410 Pts. 2 & 3
Installations for Space Heating and
Hot water Supply
BS. 5449 Pt.1
Hot water Systems
BS. 5854
Flues and Flue Structures in Buildings
BS. 5885 Pt.1
Gas Burners - with outputs of
60kW upwards
BS.6644
Installation of Gas Fired Boilers
BS.6880
Low Temperature Hot Water Heating
Systems
BS.6891
Low Pressure Gas Pipework
British Gas
Industrial Gas Fired Boilers and
Publication No. IM.11
Air Heaters
3
ASSEMBLY
For the assembly of the boiler, refer to the relevant paragraph
of the instruction book.
4
HYDRAULIC CONNECTION
Dimensional information required
WATER SYSTEM: General
Recommendations relating to the water system are contained
in BS. 5449 Pt. 1, BS. 5401 Pt. 2, and BS. 6880.
Flow & Return
in
Buccaneer GT 3
1.25
Buccaneer GT 4
1.25
Buccaneer GT 5
1.25
The following must be confirmed with:
Current Building Regulations and Clean Air Act
Water Authority Regulations
Local Authority Regulations and Regional bylaws
Gas Safety Regulations
Any special regional requirements of local Electricity and Gas
undertaking.
Fire Service and Insurance requirements.
All electrical wiring MUST comply with the current I.E.E.
regulations for the electrical equipment of buildings. In the
interests of safety, a competent installer should be employed
to effect the installation of the appliance. Manufacturer’s
notes must NOT, in any way, be taken as overriding statutory
obligations.