
Your newest and most innovative supplier of global mining components
Visit our website at www.icsweargroup.com
Or contact us directly at [email protected]
16
4.2.2 EXPELLER SEAL ASSEMBLY -Ref Fig 8
ICS pumps are supplied with metal Expeller Ring’s. On corrosive applications they can be lined with urethane.
The gland of Expeller Ring is normally fitted with packing, but can also be used with Lip Seals.
Alternative assembly methods are described below for the centrifugal seal depending upon pump and frame size.
Please contact an ICS Wear Group representative to discuss you site specific requirements.
Figure 8
- Assemble Expeller Sealed Pump
The following instructions describe the procedure to pack the gland of the metal or urethane lined Expeller
Ring, which differs according to the pump frame size.
I.
Place Expeller Ring flat on bench, gland side up
II.
Push Neck Ring into gland bore
III.
Stand Shaft Sleeve on end, and slide through Neck Ring.
IV.
Insert first Packing Ring into the Expeller Ring (or Lip Seal if not using Packing).
V.
Insert Lantern Ring and press down to flatten first Packing.
VI.
Insert remaining Packing (or Lip Seal if not using packing).