background image

ICP DAS Co., LTD 

PM-3133i Quick Start V1.00 

Page 4 

5.  When measuring the current, the secondary circuit of a CT 

should never be opened when a load is passing through its 

primary. Make sure you always open the CT clip to detach the 

CT before removing the terminal lines. Otherwise, it will cause 

severe injury.   

6.  Please handle with extra care, especially when the operation space 

of CT’s is limited. 

7.  The current direction must follow K-L marked on CT’s. 

8.  Please select the right size CT’s for different size of monitoring 

equipment cables: 

power cable diameter 

Φ10 use    60A CT

Φ10

Φ16 use 100A 

CT

Φ16

Φ24 use 200A CT   

Φ24

Φ36 use 300A or 400A CT

 

9.  The maximum current value cannot exceed the CT rating. 

 

 

Summary of Contents for PM-3133i

Page 1: ...r of electrical shock It is strongly recommended that all work should be performed only by qualified industrial electricians and metering specialist ICP DAS assumes no responsibility if your electrica...

Page 2: ...ility http ftp icpdas com pub cd powermeter pm 3133i 1 2 1 Limitation of Warranty This warranty does not apply to defects resulting from unauthorized modification misuse or use for reason other than e...

Page 3: ...hed CT s can be used The other CT s for example from panel will damage the instrument due to its large current around 5A or mA 3 When more than one smart meter PM 3133i series are installed please do...

Page 4: ...ing the terminal lines Otherwise it will cause severe injury 6 Please handle with extra care especially when the operation space of CT s is limited 7 The current direction must follow K L marked on CT...

Page 5: ...Start V1 00 Page 5 2 4 CT s installation steps At the bottom of the CT there is a K L mark Open the CT clip Make sure the power current direction follow the K L mark on the CT and then close the CT cl...

Page 6: ...ICP DAS Co LTD PM 3133i Quick Start V1 00 Page 6 2 5 Wiring 1P2W 1CT PM 3133i 1P3W 2CT PM 3133i...

Page 7: ...ICP DAS Co LTD PM 3133i Quick Start V1 00 Page 7 3P3W 3CT PM 3133i 3P4W 3CT PM 3133i...

Page 8: ...F ON OFF OFF OFF 7 OFF ON ON OFF OFF OFF 8 ON ON ON OFF OFF OFF 9 OFF OFF OFF ON OFF OFF 10 ON OFF OFF ON OFF OFF SW7 SW8 For Baud Rate Setting RS 485 CAN SW 7 SW8 9600 bps 125k Default OFF OFF 19200...

Reviews: