2.2. Voltage Input 

1.  PM-3133i series: Input Voltage up to 600V. 

 

For any higher Input Voltage large than 600V, please add the PT 

(power transformer), and Change PT RATIO setup. 

2.  Confirm the RST (ABC) phase sequence. 

2.3. Current Input 

1.  The external CT’s are fragile, please handle with care. 

2.  The CT input of PM-3133i-xxxP series is in mV range. 

Only the ex-factory attached CT’s can be used. The other CT’s, for 

example, from panel will damage the instrument due to its large 

current (around 5A or mA). 

3.  When more than one smart meter (PM-3133i series) are installed, 

please do not disconnect the CT with its original meter and mix use 

with each other. Since each set of smart meter (PM-3133i series) 

and its attached split type clip-on CT are calibrated set by set. The 

mix use may cause wrong measurements. 

 

 

4.  To install CT’s correctly, please ensure the CT lines sequences is 

right before clip the CT’s onto the power cable of the monitoring 

equipment. (Detail will be found in next section) 

Summary of Contents for PM-3133i

Page 1: ...r of electrical shock It is strongly recommended that all work should be performed only by qualified industrial electricians and metering specialist ICP DAS assumes no responsibility if your electrica...

Page 2: ...ility http ftp icpdas com pub cd powermeter pm 3133i 1 2 1 Limitation of Warranty This warranty does not apply to defects resulting from unauthorized modification misuse or use for reason other than e...

Page 3: ...hed CT s can be used The other CT s for example from panel will damage the instrument due to its large current around 5A or mA 3 When more than one smart meter PM 3133i series are installed please do...

Page 4: ...ing the terminal lines Otherwise it will cause severe injury 6 Please handle with extra care especially when the operation space of CT s is limited 7 The current direction must follow K L marked on CT...

Page 5: ...Start V1 00 Page 5 2 4 CT s installation steps At the bottom of the CT there is a K L mark Open the CT clip Make sure the power current direction follow the K L mark on the CT and then close the CT cl...

Page 6: ...ICP DAS Co LTD PM 3133i Quick Start V1 00 Page 6 2 5 Wiring 1P2W 1CT PM 3133i 1P3W 2CT PM 3133i...

Page 7: ...ICP DAS Co LTD PM 3133i Quick Start V1 00 Page 7 3P3W 3CT PM 3133i 3P4W 3CT PM 3133i...

Page 8: ...F ON OFF OFF OFF 7 OFF ON ON OFF OFF OFF 8 ON ON ON OFF OFF OFF 9 OFF OFF OFF ON OFF OFF 10 ON OFF OFF ON OFF OFF SW7 SW8 For Baud Rate Setting RS 485 CAN SW 7 SW8 9600 bps 125k Default OFF OFF 19200...

Reviews: