BIA-DPC3 rev 5
Page 3
TABLE OF CONTENTS cont.
5.0
INSTALLATION
–
BOOSTING
5.1
Function switch setting
28
5.2
Diagrams for boosting by liquid level through float switches or probes
29
6.0
INSTALLATION
–
TRANSFER
6.1
Function switch setting
33
6.2
Diagrams for transfer by liquid level through float switches or probes
34
7.0
INSTALLATION
–
TRANSFER
HOT WATER CIRCULATION
7.1
Function switch setting
37
7.2
Diagrams for transfer by liquid level through float switches or probes
38
8.0
OPERATION
8.1
Parameter calibration and erasing
39
8.2
Switching to AUTO mode
40
8.3
Switching to MANUAL mode
40
8.4
Alarm Test and MUTE
40
8.5
Pump protection
40
8.6
Last five failure record
41
8.7
Pump accumulated running time
41
8.8
Pump disable
42
9.0
COMMUNICATION LINK
42
9.1
Basic Function
42
9.2
Special application
43
9.3
Technical parameters
43
10.0
TROUBLE SHOOTING GUIDE
44