BIA-DPC3 rev 5
Page 20
3.0 INSTALLATION DRAINAGE PUMPS
–
FLOATS CONNECTED TO PANEL
3.1 Function switch setting - DRAINAGE
Installers can set the function switch to meet different applications. Before setting the function switch, the control
panel should be disconnected from the power supply.
After completing the setting, apply power to the control panel and observe the application sign displayed on the LCD
conforming to the DRAINAGE symbol.
DRAINAGE SETTING
DRAINAGE SYMBOL
SWITCHES DOWN
MCB