CAUTION:
Removing
components
from
the
upper
positions
in
the
rack
cabinet
improves
rack
stability
during
relocation.
Follow
these
general
guidelines
whenever
you
relocate
a
populated
rack
cabinet
within
a
room
or
building:
v
Reduce
the
weight
of
the
rack
cabinet
by
removing
equipment
starting
at
the
top
of
the
rack
cabinet.
When
possible,
restore
the
rack
cabinet
to
the
configuration
of
the
rack
cabinet
as
you
received
it.
If
this
configuration
is
not
known,
you
must
do
the
following:
–
Remove
all
devices
in
the
32U
position
and
above.
–
Ensure
that
the
heaviest
devices
are
installed
in
the
bottom
of
the
rack
cabinet.
–
Ensure
that
there
are
no
empty
U-levels
between
devices
installed
in
the
rack
cabinet
below
the
32U
level.
v
If
the
rack
cabinet
you
are
relocating
is
part
of
a
suite
of
rack
cabinets,
detach
the
rack
cabinet
from
the
suite.
v
Inspect
the
route
that
you
plan
to
take
to
eliminate
potential
hazards.
v
Verify
that
the
route
that
you
choose
can
support
the
weight
of
the
loaded
rack
cabinet.
Refer
to
the
documentation
that
comes
with
your
rack
cabinet
for
the
weight
of
a
loaded
rack
cabinet.
v
Verify
that
all
door
openings
are
at
least
760
x
230
mm
(30
x
80
in.).
v
Ensure
that
all
devices,
shelves,
drawers,
doors,
and
cables
are
secure.
v
Ensure
that
the
four
leveling
pads
are
raised
to
their
highest
position.
v
Ensure
that
there
is
no
stabilizer
bracket
installed
on
the
rack
cabinet
during
movement.
v
Do
not
use
a
ramp
inclined
at
more
than
ten
degrees.
v
Once
the
rack
cabinet
is
in
the
new
location,
do
the
following:
–
Lower
the
four
leveling
pads.
–
Install
stabilizer
brackets
on
the
rack
cabinet.
–
If
you
removed
any
devices
from
the
rack
cabinet,
repopulate
the
rack
cabinet
from
the
lowest
position
to
the
highest
position.
v
If
a
long
distance
relocation
is
required,
restore
the
rack
cabinet
to
the
configuration
of
the
rack
cabinet
as
you
received
it.
Pack
the
rack
cabinet
in
the
original
packaging
material,
or
equivalent.
Also
lower
the
leveling
pads
to
raise
the
casters
off
of
the
pallet
and
bolt
the
rack
cabinet
to
the
pallet.
(R002)
Verify
Kit
Contents
U
Description
1
fixed
shelf
4
screws
2
tie
wraps
Installation
Instructions
(Feature
7003)
Tools
Required
v
7
mm
nut
driver
or
7
mm
socket
wrench
86
IBM
TotalStorage
3580
Tape
Drive
Setup,
Operator,
and
Service
Guide
Summary of Contents for TotalStorage 3580 L33
Page 1: ...IBM TotalStorage 3580 Tape Drive Model L33 L3H Setup Operator and Service Guide GC26 7708 03...
Page 2: ......
Page 3: ...IBM TotalStorage 3580 Tape Drive Model L33 L3H Setup Operator and Service Guide GC26 7708 03...
Page 6: ...iv IBM TotalStorage 3580 Tape Drive Setup Operator and Service Guide...
Page 10: ...viii IBM TotalStorage 3580 Tape Drive Setup Operator and Service Guide...
Page 12: ...x IBM TotalStorage 3580 Tape Drive Setup Operator and Service Guide...
Page 47: ...A67E0026 1 Figure 11 Setting the write protect switch Using Ultrium Media 29...
Page 72: ...54 IBM TotalStorage 3580 Tape Drive Setup Operator and Service Guide...
Page 84: ...66 IBM TotalStorage 3580 Tape Drive Setup Operator and Service Guide...
Page 102: ...84 IBM TotalStorage 3580 Tape Drive Setup Operator and Service Guide...
Page 141: ......
Page 142: ...Part Number 23R6251 Printed in USA GC26 7708 03 1P P N 23R6251...