Routing
the
cables
through
the
cable-management
arm
__
Is
your
server
installed
in
a
rack?
v
No.
Proceed
to
the
next
section,
Starting
your
server.
v
Yes.
Do
the
following:
__
Put
the
system
into
the
service
position.
v
For
the
models
510
and
510Q,
see
v
For
the
models
520,
520Q,
550,
550Q,
560Q,
and
570,
see
__
Route
the
cables
through
the
hooks
along
the
cable-management
arm
and
secure
them
with
the
straps
provided.
__
After
attaching
the
cables
to
the
cable-management
arm,
go
to
the
front
of
the
rack
and
move
the
system
drawer
in
and
out.
Observe
cables
and
cable-management-arm
movement
to
verify
that
the
cables
are
not
binding.
Starting
your
server
__
Power
the
system
on
(see
Note:
Expect
a
delay
between
the
time
when
power
is
applied
to
the
server
or
workstation
and
when
an
initial
program
load
(IPL)
can
be
performed.
When
power
is
initially
applied
to
the
server
or
workstation,
the
service
processor
performs
a
self-check
and
will
leave
the
control
panel
blank
for
up
to
two
minutes.
Wait
until
the
C1XX
XXXX
progress
codes
are
completed
and
01
is
displayed
on
the
control
panel
before
you
perform
an
IPL
or
change
control
panel
functions.
Cabling
your
server
69
Summary of Contents for System p Series
Page 1: ...System i and System p Cabling your server ...
Page 2: ......
Page 3: ...System i and System p Cabling your server ...
Page 6: ...iv System i and System p Cabling your server ...
Page 193: ......
Page 194: ... Printed in USA ...