After
you
finish
__
Did
you
receive
a
cable
hook
with
your
rack
shipment?
v
No.
Proceed
to
the
next
item.
v
Yes.
The
cable
hook
can
help
manage
the
server
cables
in
the
back
of
the
rack.
To
install
the
cable
hook,
slide
it
into
the
slots
located
on
the
back
of
the
rack
as
shown
in
the
following
figure:
__
Return
to
your
initial
server
setup
checklist
and
complete
the
next
step.
Cabling
your
OpenPower
720
server
with
a
console
For
a
graphical
representation
of
the
slots
and
connectors
that
are
referred
to
in
this
topic,
see
the
Cabling
the
OpenPower
720
and
an
ASMI
console
Complete
the
following
tasks
to
cable
your
server:
Before
you
begin
__
If
you
have
hardware
features
that
are
not
installed,
install
them
now.
See
for
instructions.
Connecting
the
Advanced
System
Management
Interface
(ASMI)
__
If
you
plan
to
connect
a
PC
(with
a
browser)
to
the
server
to
access
the
ASMI,
see
for
instructions.
Cabling
your
server
153
Summary of Contents for System p Series
Page 1: ...System i and System p Cabling your server ...
Page 2: ......
Page 3: ...System i and System p Cabling your server ...
Page 6: ...iv System i and System p Cabling your server ...
Page 193: ......
Page 194: ... Printed in USA ...