356
RS/6000 SP and Clustered IBM
^
pSeries Systems Handbook
Figure 10-20 Changing a 31-node CES system to an SP system
Recommended expansion plan
If you are thinking of scaling up your CES system to an SP system in the future,
you have to plan out appropriate frame numbers and switch port numbers for
your Enterprise Servers so that they will still be valid when you add SP frames at
a later time.
There can be many expansion plans. An expansion plan could be considered
when you plan to upscale from a CES system to a switchless SP system.
Another expansion plan could be considered when you plan to upscale from a
CES system to a switched SP system
Both expansion plans take in consideration numbers such as:
Size of CES
Frame/Node Type
Frame Number
Node Number
Attention: You have to plan the appropriate frame and switch port numbers
that will work in an SP system with SP frames when you first install your CES
system. This way you can migrate to an SP system without having to
reconfigure your Enterprise Servers that are already installed.
12
SP Switch
(slo t 13)
IBM
28
SP Sw itch
(slot 13 )
31 SP -a ttached se rvers
High/W ide/Thin
node can be added
in switch port 12 or
28 in future.
Summary of Contents for RS/6000 SP
Page 2: ......
Page 6: ...iv RS 6000 SP and Clustered IBM pSeries Systems Handbook...
Page 16: ...xiv RS 6000 SP and Clustered IBM pSeries Systems Handbook...
Page 48: ...24 RS 6000 SP and Clustered IBM pSeries Systems Handbook...
Page 100: ...76 RS 6000 SP and Clustered IBM pSeries Systems Handbook...
Page 182: ...158 RS 6000 SP and Clustered IBM pSeries Systems Handbook...
Page 218: ...194 RS 6000 SP and Clustered IBM pSeries Systems Handbook...
Page 284: ...260 RS 6000 SP and Clustered IBM pSeries Systems Handbook...
Page 388: ...364 RS 6000 SP and Clustered IBM pSeries Systems Handbook...
Page 436: ...412 RS 6000 SP and Clustered IBM pSeries Systems Handbook...
Page 477: ...0 1 spine 0 1 0 169 53 89 pages RS 6000 SP and Clustered IBM pSeries Systems Handbook...
Page 478: ......
Page 479: ......