Percent of Time Faulting, Per Day
Daily Percent of Time Faulting Graph
The Percent of Time Faulting, Per Day graph shows the time spent faulting in a percent for each
day for the last three months, or the period you choose.
The Peak represents the single busiest hour during the shift. The information under the Facts
heading at the bottom of the graph outlines the recommended guidelines for marginal and critical
percentage.
PM for Power Systems Graph Reference Document
51