
Then select the system, systems or partitions you wish to include in the sizing by selecting the
respective boxes.
Select the servers to transfer to WLE, then click ‘Submit Servers for Sizing’.
Your PM for Power Systems data for these partitions is automatically loaded into the Workload
Estimator when you follow subsequent prompts.
PM for Power Systems Graph Reference Document
7