
138
IBM NeXtScale System Planning and Implementation Guide
The Front Cable Management Bracket kit (part number 00Y3016) that attaches
to the front of the rack is shown in Figure 5-14. This kit includes four brackets,
which are enough for one rack (two brackets are installed on each side of the
rack).
Figure 5-14 Cable management bracket
M5 screws
(x10)
M5 clip nut
(x10)
Cable management
brackets (x2)
Summary of Contents for NeXtScale System
Page 2: ......
Page 16: ...xiv IBM NeXtScale System Planning and Implementation Guide...
Page 26: ...8 IBM NeXtScale System Planning and Implementation Guide...
Page 132: ...114 IBM NeXtScale System Planning and Implementation Guide...
Page 263: ...0 5 spine 0 475 0 875 250 459 pages IBM NeXtScale System Planning and Implementation Guide...
Page 264: ......
Page 265: ......