68
Gateway specific requirements for Multipath
S
torage
General
requirements
The following table summarizes the general requirements for the gateway with
Multipath Storage.
For this...
The requirement is...
Gateway port requirements
◆
Two Fibre Channel ports for each loop
◆
Enough onboard Fibre Channel ports or
HBAs on each node to accommodate
the extra cables required for Multipath
Storage.
Gateway boot environment
variable setting
Configure the
fc-non-array-adapter-
list
environment variable for each new loop
before
you connect and configure the shelf
for Multipath Storage.
Setup overview—Multipath Storage on
” on page 69 for instructions.
Number of loops to be cabled
For maximum protection, it is recommended
that all loops are cabled for Multipath
Storage. If you have a mixed configuration
in which some loops are cabled for
Multipath Storage and some are not, the
system displays a configuration error
message when you boot the system or when
a disk on a loop that is cabled for Multipath
becomes single-pathed.
Summary of Contents for N Series
Page 6: ...vi Notices...
Page 14: ...xiv Preface...
Page 28: ...14 Understanding storage provided by native disk shelves...
Page 78: ...64 Configuring Gateway Ports as Initiators...
Page 98: ...84 Reinstalling the system...
Page 104: ......