▌1▐
Frame
▌2▐
Support nut
▌3▐
Leveler feet
▌4▐
Load plate
▌5▐
Rubber bushing
▌6▐
Shaft
Complete the following steps to prepare your raised floor by using Figure 19 on
page 147 and Figure 20 as references.
Procedure
1.
Cut the following openings in the raised floor for each frame that uses an
earthquake resistance kit:
v
Four holes for the rubber bushings of the kit to fit through the floor.
1
Raised floor
2
3
4
5
6
f2c02300
Figure 20. Earthquake resistance kit installed on a raised floor
148
DS8880 Introduction and Planning Guide
Summary of Contents for DS8880 Series
Page 1: ...IBM DS8880 Version 8 Release 5 Introduction and Planning Guide GC27 8525 16 IBM...
Page 12: ...xii DS8880 Introduction and Planning Guide...
Page 52: ...40 DS8880 Introduction and Planning Guide...
Page 68: ...56 DS8880 Introduction and Planning Guide...
Page 138: ...126 DS8880 Introduction and Planning Guide...
Page 184: ...172 DS8880 Introduction and Planning Guide...
Page 190: ...178 DS8880 Introduction and Planning Guide...
Page 194: ...182 DS8880 Introduction and Planning Guide...
Page 200: ...188 DS8880 Introduction and Planning Guide...
Page 206: ...194 DS8880 Introduction and Planning Guide...
Page 208: ...196 DS8880 Introduction and Planning Guide...
Page 216: ...204 DS8880 Introduction and Planning Guide...
Page 220: ...208 DS8880 Introduction and Planning Guide...
Page 222: ...210 DS8880 Introduction and Planning Guide...
Page 243: ......
Page 244: ...IBM Printed in USA GC27 8525 16...