3.
Install the eyebolt fasteners in the concrete floor by using the following
guidelines:
v
See Figure 21 on page 149 and Figure 23 to determine the placement of the
eyebolts. The eyebolts must be installed so that they are directly below the
holes that you cut in the raised floor for the rubber bushings.
v
Ensure that the installed eyebolts do not exceed a height of 10.1 cm (4 in.)
from the floor to the center of the eye. This maximum height helps to reduce
any bending of the eyebolt shaft.
v
Ensure that the installation allows the eyebolts to meet the required pull
force after they are installed (3600-pound pull force for raised floor eyebolts).
v
If you use a threaded eyebolt that secures into a threaded insert in the floor,
consider using a jam nut and washer on the shaft of the eyebolt. Talk to your
consultant or structural engineer to determine whether a jam nut is
necessary.
Preparing a nonraised floor for the earthquake resistance kit:
You must prepare a nonraised floor before an earthquake resistance kit can be
installed on any frame in your storage system.
f2c00815
Spacer
Shaft
Eyebolt
Lower
jaw
Lower
jaw
Side view of eyebolt
Lower jaw
opening
2.8 cm (1.1 in.)
Spacer
1.8 cm (0.7 in.)
Washer
Jam nut
2
1
Figure 23. Eyebolt required dimensions. Dimensions are in millimeters (inches).
Chapter 6. Delivery and installation requirements
151
Summary of Contents for DS8880 Series
Page 1: ...IBM DS8880 Version 8 Release 5 Introduction and Planning Guide GC27 8525 16 IBM...
Page 12: ...xii DS8880 Introduction and Planning Guide...
Page 52: ...40 DS8880 Introduction and Planning Guide...
Page 68: ...56 DS8880 Introduction and Planning Guide...
Page 138: ...126 DS8880 Introduction and Planning Guide...
Page 184: ...172 DS8880 Introduction and Planning Guide...
Page 190: ...178 DS8880 Introduction and Planning Guide...
Page 194: ...182 DS8880 Introduction and Planning Guide...
Page 200: ...188 DS8880 Introduction and Planning Guide...
Page 206: ...194 DS8880 Introduction and Planning Guide...
Page 208: ...196 DS8880 Introduction and Planning Guide...
Page 216: ...204 DS8880 Introduction and Planning Guide...
Page 220: ...208 DS8880 Introduction and Planning Guide...
Page 222: ...210 DS8880 Introduction and Planning Guide...
Page 243: ......
Page 244: ...IBM Printed in USA GC27 8525 16...