IBM System Storage DR550
Version 3.0 ------17 March 2006
Page 3
IBM Storage Systems
Copyright © 2006 by International Business Machines Corporation
INSTALLATION AND ACTIVATION ............................................................................. 30
Safety Notices
..........................................................................................................................................................30
Site Preparation and Planning
.............................................................................................................................31
Unpacking and Installing the Rack(s)
................................................................................................................32
Positioning the Rack
.........................................................................................................................................32
Leveling the Rack
...............................................................................................................................................32
Attaching the Rack to a Concrete Floor
.......................................................................................................33
Attach the Rack to a Concrete Floor Beneath a Raised Floor
................................................................36
Connecting the Racks in a Suite (applies only to dual node 89.6 TB Configuration)
......................38
Cabling between the Racks
.............................................................................................................................40
Cabling to the customer’s Ethernet / IP Network
...........................................................................................41
Single Node Configurations
.................................................................................................................................41
Dual Node Configurations
....................................................................................................................................43
Setting up the Management Console
................................................................................................................44
Userid and Password
........................................................................................................................................44
Changing Server Names
..................................................................................................................................44
Connecting AC Power
...........................................................................................................................................47
Configuring the P5 520 Servers
..........................................................................................................................49
User Accounts
....................................................................................................................................................49
Connecting to Gigabit Ethernet (Fibre) Network
.......................................................................................50
Connecting to a 10/100/1000 Mbps Ethernet (copper) Network
.............................................................51
Procedure for Changing IP Address
.............................................................................................................53
Configuring the Dual Node System (P5 520 Servers)
....................................................................................55
Connecting to Gigabit Ethernet (Fibre) Network
.......................................................................................56
Connecting to 10/100/1000 Ethernet (Copper) Network
...........................................................................58
HACMP Configuration
...........................................................................................................................................59
Procedures for Changing IP Addresses
.......................................................................................................59
Cluster Snapshot........................................................................................................................................................72
REMOTE MIRRORING ................................................................................................. 74
Zoning diagrams (single and dual node)..................................................................................................................74
Setting up DR550 for remote mirroring
.............................................................................................................77
Recovery from the primary failure
......................................................................................................................78
Setting up DR550 for mirroring back to original site
.....................................................................................80
OTHER INSTALLATION TOPICS ................................................................................ 81
Changing passwords
.............................................................................................................................................81