11.
Squeeze the two blue tabs to release the system processor module from the tool as shown in
Figure 70 on page 61.
Figure 69. Placing the processor at an angle on the top cover of the packaging
60
Power Systems: Servicing the IBM Power System LC921 (9006-12C)
Summary of Contents for 9006-12C
Page 1: ...Power Systems Servicing the IBM Power System LC921 9006 12C IBM...
Page 2: ......
Page 3: ...Power Systems Servicing the IBM Power System LC921 9006 12C IBM...
Page 16: ...xiv Power Systems Servicing the IBM Power System LC921 9006 12C...
Page 112: ...96 Power Systems Servicing the IBM Power System LC921 9006 12C...
Page 124: ...108 Power Systems Servicing the IBM Power System LC921 9006 12C...
Page 125: ......
Page 126: ...IBM Printed in USA...