![IBM 9006-12C Manual Download Page 108](http://html1.mh-extra.com/html/ibm/9006-12c/9006-12c_manual_3354776108.webp)
About this task
CAUTION:
or
or
The weight of this part or unit is between 18 and 32 kg (39.7 and 70.5 lb). It takes two persons to
safely lift this part or unit. (C009)
Procedure
1.
Using two people, one on each side of the system, lift the system from the table.
2.
Align the system rails on each side of the system with the rack rails.
3.
Push the system into the rack until you hear each rail click into place.
4.
Before releasing your hold on the system, ensure that the rails are engaged by sliding the system
forward into service lock position. Check that the rails are properly seated. If the rails are not fully
engaged, the system could drop.
5.
Release the rail safety latches (A) by lifting them upward, as shown in Figure 92, then push the
system fully into the rack. The safety latches work in opposite directions; the latch on one side moves
up while the latch on the other side moves down.
6.
Fasten the two front screws (C) to secure the system to the rack.
7.
Using your labels, reconnect the cables at the rear of the system unit.
8.
If you removed the storage drives, using your labels, replace the drives in their proper locations.
Figure 92. Placing the system into the operating position
92
Power Systems: Servicing the IBM Power System LC921 (9006-12C)
Summary of Contents for 9006-12C
Page 1: ...Power Systems Servicing the IBM Power System LC921 9006 12C IBM...
Page 2: ......
Page 3: ...Power Systems Servicing the IBM Power System LC921 9006 12C IBM...
Page 16: ...xiv Power Systems Servicing the IBM Power System LC921 9006 12C...
Page 112: ...96 Power Systems Servicing the IBM Power System LC921 9006 12C...
Page 124: ...108 Power Systems Servicing the IBM Power System LC921 9006 12C...
Page 125: ......
Page 126: ...IBM Printed in USA...