Completing the installation
To complete your installation, you must reinstall the bezel, reinstall the side cover,
connect all the cables and, for certain options, run the Configuration/Setup Utility
program. Follow the instructions in this section.
Replacing the bezel
The following illustration shows how to install the bezel on the server.
Complete the following steps to replace the bezel:
1. Insert the two tabs on the bottom of the bezel into the matching holes on the
server chassis.
2. Push the top of the bezel toward the server until the two tabs at the top of the
bezel snap into place.
3. For hot-swap hard disk drive models, make sure the side cover is unlocked;
then, insert the hot-swap lock bar into the slots on the bezel and rotate it to the
locked position. The hot-swap lock bar locks when you lock the side cover key
lock.
34
IBM xSeries 225 Type 8647: Installation Guide
Summary of Contents for 8647 - Eserver xSeries 225
Page 3: ...IBM xSeries 225 Type 8647 Installation Guide ERserver...
Page 15: ...23 50 110 50 110 23 50 50 23 50 50 Safety xiii...
Page 16: ...23 50 110 50 110 50 Kg 50 23 23 50 110 50 110 xiv IBM xSeries 225 Type 8647 Installation Guide...
Page 17: ...23 50 110 50 110 23 50 50 23 50 110 50 110 Safety xv...
Page 20: ...xviii IBM xSeries 225 Type 8647 Installation Guide...
Page 70: ...Figure 7 Hints and tips feature 50 IBM xSeries 225 Type 8647 Installation Guide...
Page 72: ...52 IBM xSeries 225 Type 8647 Installation Guide...
Page 80: ...60 IBM xSeries 225 Type 8647 Installation Guide...
Page 106: ...86 IBM xSeries 225 Type 8647 Installation Guide...
Page 110: ...90 IBM xSeries 225 Type 8647 Installation Guide...
Page 111: ......
Page 112: ...Part Number 88P9294 Printed in U S A 1P P N 88P9294...