
Figure 24. Front and rear views of the rails - left rail
After installing the necessary components, mount the MTM 5149 - 23E server chassis in a rack.
• Sliding rail kit
• Sliding rails x 2
• Rail screw pack (includes 4 rail screws, 4 rack screws, 2 washers)
Figure 25. Screws and washers included in the rail kit
1. Remove the inner rail from both the right and the left rail.
a. Slide the middle rail until it stops; then, push the white tab forward and take out the inner rail.
54 IBM Storage Scale System Utility Node: Hardware Planning and Installation Guide
Summary of Contents for 6.1.8.2
Page 8: ...viii...
Page 20: ...xx IBM Storage Scale System Utility Node Hardware Planning and Installation Guide...
Page 90: ...70 IBM Storage Scale System Utility Node Hardware Planning and Installation Guide...
Page 96: ...76 IBM Storage Scale System Utility Node Hardware Planning and Installation Guide...
Page 100: ...80 IBM Storage Scale System Utility Node Hardware Planning and Installation Guide...
Page 102: ...82 IBM Storage Scale System Utility Node Hardware Planning and Installation Guide...
Page 110: ...90 IBM Storage Scale System Utility Node Hardware Planning and Installation Guide...
Page 112: ...92 IBM Storage Scale System Utility Node Hardware Planning and Installation Guide...
Page 113: ......
Page 114: ...IBM Product Number 5765 DME 5765 DAE SC28 3469 00...