![background image](http://html1.mh-extra.com/html/ibm/4810-e3h/4810-e3h_installation-and-service-manual_3434510031.webp)
Removing and installing the memory module
Figure 10. Opening the memory-module
retainer clips
2
1
Figure 11. Memory-module retainer clips in
the open position.
To remove the memory module:
1. Open the unit. See “Removing and installing the top cover” on page 12.
2. Remove the hard drive and tray assembly. See “Removing and installing the
hard disk drive and hard disk tray as an assembly” on page 15
3. Rotate the memory-module-retainer clips
1
to the open position. The memory
module is disengaged from the memory connector. See Figure 11.
4. Lift the memory module
2
straight up to remove it from the memory connector.
See Figure 11.
1
2
Figure 12. Installing the memory module
Figure 13. Closing the memory-module
retainer clips
To install the memory module:
1. Position the replacement memory module
1
over the memory connector. Be
sure the notch on the memory module aligns correctly with the connector
key
2
on the memory connector. See Figure 12.
2. Align the memory module with the memory socket and push down engaging the
memory-module retainer clips; push down firmly to engage.
Note:
Be sure the memory-module retainer clips are fully closed. See
Figure 13.
3. Replace the hard drive and tray assembly. See “Removing and installing the
hard disk drive and hard disk tray as an assembly” on page 15.
4. Replace the top cover. See “Removing and installing the top cover” on page 12.
March 2009
Chapter 3. Removal and installation procedures for the 4810/4910 SurePOS 300
17
Summary of Contents for 4810-E3H
Page 1: ...SurePOS 300 Installation and Service Guide for 4810 4910 Model x4x G362 0560 00 March 2009...
Page 2: ......
Page 3: ...SurePOS 300 Installation and Service Guide for 4810 4910 Model x4x G362 0560 00 March 2009...
Page 8: ...March 2009 vi SurePOS Installation and Service...
Page 10: ...March 2009 viii SurePOS Installation and Service...
Page 14: ...March 2009 xii SurePOS Installation and Service...
Page 22: ...Product introduction March 2009 8 SurePOS Installation and Service...
Page 24: ...March 2009 10 SurePOS Installation and Service...
Page 42: ...March 2009 28 SurePOS Installation and Service...
Page 54: ...Assembly 1 continued March 2009 40 SurePOS Installation and Service...
Page 56: ...March 2009 42 SurePOS Installation and Service...
Page 64: ...March 2009 50 SurePOS Installation and Service...
Page 69: ...IBM IBM GA27 4004 GA27 4004 March 2009 Appendix B Safety information 55...
Page 84: ...March 2009 70 SurePOS Installation and Service...
Page 87: ......