© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch
30
The top vented panel slides in with the floor towards the top and the bottom vented
panel slides in with the floor towards the bottom. This creates a sealed 2U duct
opening.
(L003)
DANGER: Multiple power cords. The product might be equipped with multiple AC power
cords or multiple DC power cables. To remove all hazardous voltages, disconnect all
power cords and power cables. (L003)
STEP 12
Summary of Contents for 3454-A3C
Page 24: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 24...
Page 25: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 25...
Page 26: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 26...
Page 33: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 33...
Page 34: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 34...
Page 35: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 35...
Page 37: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 37...
Page 51: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 51...