© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch
6
DANGER: When working on or around the system, observe the following precautions:
Electrical voltage and current from power, telephone, and communication cables are hazardous. To
avoid a shock hazard:
If IBM supplied the power cord(s), connect power to this unit only with the IBM provided power
cord. Do not use the IBM provided power cord for any other product.
Do not open or service any power supply assembly.
Do not connect or disconnect any cables or perform installation, maintenance, or
reconfiguration of this product during an electrical storm.
The product might be equipped with multiple power cords. To remove all hazardous voltages,
disconnect all power cords.
o
For AC power, disconnect all power cords from their AC power source.
o
For racks with a DC power distribution panel (PDP), disconnect the customer’s DC power
source to the PDP.
When connecting power to the product ensure all power cables are properly connected.
o
For racks with AC power, connect all power cords to a properly wired and grounded
electrical outlet. Ensure that the outlet supplies proper voltage and phase rotation
according to the system rating plate.
o
For racks with a DC power distribution panel (PDP), connect the customer’s DC power
source to the PDP. Ensure that the proper polarity is used when attaching the DC power
and DC power return wiring.
Connect any equipment that will be attached to this product to properly wired outlets.
When possible, use one hand only to connect or disconnect signal cables.
Never turn on any equipment when there is evidence of fire, water, or structural damage.
Do not attempt to switch on power to the machine until all possible unsafe conditions are
corrected.
Assume that an electrical safety hazard is present. Perform all continuity, grounding, and power
checks specified during the subsystem installation procedures to ensure that the machine meets
safety requirements.
Do not continue with the inspection if any unsafe conditions are present.
Before you open the device covers, unless instructed otherwise in the installation and
configuration procedures: Disconnect the attached AC power cords, turn off the applicable
circuit breakers located in the rack power distribution panel (PDP), and disconnect any
telecommunications systems, networks, and modems.
Summary of Contents for 3454-A3C
Page 24: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 24...
Page 25: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 25...
Page 26: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 26...
Page 33: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 33...
Page 34: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 34...
Page 35: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 35...
Page 37: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 37...
Page 51: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 51...