© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch
27
Step 7
For stacked installation of adjacent switch assemblies in a rack, the duct kits need to
have their screw-in floors removed.
Remove the floor by unscrewing the four screws
on each side of the duct rail.
STEP 8
Convert side rail from storage position to overlap position by removing the (3)
screws on the side blocking plate and reinstalling them in the lower three holes to
extend below the lower edge of the rail. (2 pls). This will block excess hot air
from entering between the switch rails.
Move (3) screws down to
bottom holes to lower
blocking plate (both sides)
Summary of Contents for 3454-A3C
Page 24: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 24...
Page 25: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 25...
Page 26: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 26...
Page 33: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 33...
Page 34: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 34...
Page 35: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 35...
Page 37: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 37...
Page 51: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 51...