© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch
31
ALL OPEN RACK BAYS REQUIRE FILLERS TO PREVENT HOT AIR FROM
RECIRCULATING TO THE FRONT OF THE RACK AND INTO THE COLD
AIR INLETS.
DO NOT BLOCK ANY INLET OR EXHAUST DUCTS, VENTS OR PORTS
KEEP ALL POWER CORDS, SIGNAL CABLES AND TRANSCEIVERS WITH
THE INSTALLED CHASSIS FOR USE BY IBM INSTALLERS.
DO NOT POWER-ON THIS CHASSIS. POWER ON WILL BE DONE BY
YOUR IBM INSTALLATION TEAM.
Summary of Contents for 3454-A3C
Page 24: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 24...
Page 25: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 25...
Page 26: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 26...
Page 33: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 33...
Page 34: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 34...
Page 35: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 35...
Page 37: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 37...
Page 51: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 51...