DANGER
You
have
already
switched
on
the
2145
UPS-1U.
The
output
sockets
of
the
2145
UPS-1U
are
live.
3.
Plug
the
signal
cable
into
the
serial
connector
3
located
on
the
SAN
Volume
Controller
2145-8G4.
4.
Place
the
other
end
of
the
signal
cable
into
the
communication
port
6
on
the
2145
UPS-1U.
The
SAN
Volume
Controller
2145-8G4
power
is
now
connected
to
the
2145
UPS-1U.
Installing
the
SAN
Volume
Controller
2145-8G4
cable
retention
bracket
The
cable
retention
bracket
ensures
that
the
SAN
Volume
Controller
2145-8G4
node
does
not
mistakenly
become
unplugged
from
the
uninterruptible
power
supply
(UPS).
The
SAN
Volume
Controller
2145-8G4
comes
with
one
of
two
different
cable
retention
brackets.
Depending
on
which
bracket
you
have,
use
the
appropriate
instructions
to
install
the
cable
retention
bracket.
v
If
your
cable
retention
bracket
looks
like
the
following,
go
to
v
If
your
cable
retention
bracket
looks
like
the
following,
go
to
svc00363
Chapter
6.
Installing
the
SAN
Volume
Controller
2145-8G4
hardware
55
|
|
|
|
|
|
|
|
|
|
|
Summary of Contents for 2145UPS-1U
Page 2: ......
Page 8: ...vi IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 56: ...18 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 72: ...34 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 102: ...64 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 138: ...100 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 190: ...152 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 192: ...154 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 200: ...162 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 228: ...190 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 231: ......
Page 232: ...Part Number 31P1046 Printed in USA GC27 2132 01 1P P N 31P1046...