2.
Check
the
condition
of
the
inside
of
the
machine
for
any
metal
or
other
contaminants,
or
any
indications
of
water,
other
fluid,
fire,
or
smoke
damage.
3.
Check
for
any
obvious
mechanical
problems,
such
as
loose
components.
4.
Check
any
exposed
cables
and
connectors
for
wear,
cracks,
or
pinching.
Checking
the
grounding
of
a
SAN
Volume
Controller,
the
UPS,
and
the
redundant
ac
power
switch
Ensure
that
you
understand
how
to
check
the
grounding
of
a
SAN
Volume
Controller,
the
uninterruptible
power
supply
(UPS),
and
the
optional
redundant
ac
power
feature.
All
SAN
Volume
Controller
models
support
the
use
of
the
2145
uninterruptible
power
supply-1U
(2145
UPS-1U)
and
the
optional
redundant
ac
power
switch.
The
SAN
Volume
Controller
2145-4F2
also
supports
the
use
of
the
2145
UPS.
Perform
the
following
steps
to
test
the
grounding
of
a
SAN
Volume
Controller.
Follow
the
steps
for
the
SAN
Volume
Controller
configuration
you
are
using.
Before
you
start,
confirm
you
know
the
SAN
Volume
Controller
model
type,
the
UPS
type,
and
whether
you
are
using
redundant
ac
power.
Note
the
location
of
the
signal
cables
that
are
attached
to
the
SAN
Volume
Controller.
When
you
are
asked
to
test
the
grounding
continuity,
use
your
local
procedures
to
perform
the
test.
The
test
is
successful
if
the
measured
resistance
is
0.1
ohm
or
less.
Attention:
Some
electrical
circuits
can
be
damaged
if
the
external
signal
cables
are
present
at
the
SAN
Volume
Controller
while
it
is
undergoing
a
grounding
test.
1.
Ensure
that
the
SAN
Volume
Controller
node
is
powered
off.
See
“MAP
5350:
Powering
off
a
SAN
Volume
Controller
node”
in
the
IBM
System
Storage
SAN
Volume
Controller:
Service
Guide
.
2.
If
the
UPS
is
a
2145
UPS,
ensure
that
other
SAN
Volume
Controller
nodes
that
are
powered
from
the
UPS
are
powered
off.
3.
Use
the
power
button
to
power
off
the
UPS.
4.
Disconnect
all
signal
cables
from
the
SAN
Volume
Controller
node,
which
includes
the
following
cables:
v
The
fibre
channel
cables
v
The
Ethernet
cable
v
The
serial
cable
that
is
connected
to
the
UPS.
5.
Disconnect
all
signal
cables
from
the
UPS.
If
the
UPS
is
a
2145
UPS,
there
might
be
multiple
signal
cables.
6.
If
the
UPS
is
a
2145
UPS,
disconnect
any
power
cables
that
are
connected
to
SAN
Volume
Controller
nodes,
except
the
one
that
is
being
tested.
7.
If
redundant
ac
power
is
not
used,
disconnect
the
UPS
power
cable
from
the
site
power
distribution
unit.
8.
If
redundant
ac
power
is
used,
power
off
any
SAN
Volume
Controller
that
is
being
supplied
from
the
redundant
ac
power
switch,
and
remove
the
power
cable
to
this
system
from
the
redundant
ac
power
switch.
9.
If
redundant
ac
power
is
used,
disconnect
both
input
power
leads
from
the
site
power
distribution
units.
10.
If
redundant
ac
power
is
not
used,
test
the
grounding
continuity
between
a
conductive
area
on
the
SAN
Volume
Controller
frame
and
the
ground
pin
on
the
plug
of
the
UPS
input
power
cable.
About
this
guide
xix
Summary of Contents for 2145UPS-1U
Page 2: ......
Page 8: ...vi IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 56: ...18 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 72: ...34 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 102: ...64 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 138: ...100 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 190: ...152 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 192: ...154 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 200: ...162 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 228: ...190 IBM System Storage SAN Volume Controller Hardware Installation Guide...
Page 231: ......
Page 232: ...Part Number 31P1046 Printed in USA GC27 2132 01 1P P N 31P1046...