Installation & Commissioning Report
Model Number _____________________ Serial Number ___________________________
Date of Installation ________ Address of installation ____________________________
User contact information ______________________________________________________
Installer Information (Company & Address)____________________________________
Phone/Fax/E-mail ______________________________________________________________
Fuel:
□
Natural Gas
□
Propane
Gas Supply Pressure (high fire) ____ Inches w.c. Measured Rate of Input (high fire) _____Btu/hr
□
Leak testing completed
□
Gas piping
□
Venting system
□
Fan
□
combustion components
□
System Cleaned and Flushed (type of cleaner used) _______________________________
□
System Filled (type/concentration of any glycol/chemicals used) ___________________
□
Air purge completed
□
Relief Valve correctly installed and piped Relief valve “try lever” test performed
□
Condensate trap filled Condensate drain clear and free flowing Condensate Neutralization.
□
Ignition Safety Shutoff test completed. Flame current reading - High fire _____ µA - Low fire __
___ µA
□
Owner advised and instructed in the safe operation and maintenance of the boiler and system.
□
Information regarding the appliance and installation received and left with owner
Combustion Readings: CO
2
_____________ % O
2
______________ % CO ____________ ppm
Flue temperature ___ Return water temperature (measure simultaneously with flue temp.) _____
Commissioning has been completed as listed on this report - Installer's Signature _____________
Installers: send this completed sheet - Fax to 604 877 0295 - or - scan and Email to
[email protected].
122
Section: Troubleshooting
Summary of Contents for CX Series
Page 10: ...Intentionally left empty...
Page 70: ...Intentionally left empty...
Page 84: ...Intentionally left empty...
Page 102: ...Intentionally left empty...
Page 114: ...Appendices Wiring diagrams Figure 48 Controller electrical diagram 114 Section Troubleshooting...
Page 115: ...Figure 49 Internal wiring diagram 115 Wiring diagrams...
Page 116: ...Figure 50 Sequence of Operation 116 Section Troubleshooting...