Version: 23.01
As of: 01/2023
Page
35
from
119
Step 3:
•
Fit roof hooks using screws (6) and (4) and additionally secure the reinforcing runner to the batten using screw (4) (may
alternatively be fastened from the top).
Information
If the existing screw connection of the counter battens cannot adequately dissipate the forces that occur during the on-site
structural check, it is possible to reinforce them with the ASD screws from "Figure 34 Overview of screw lengths". The number and
position of the screws must be based on the structural requirements.
Figure 42 Connecting sheet metal roof tiles with batten rail
Figure 43 Possible position of the ASD countersunk and flat head screws
Summary of Contents for TopFix 200
Page 1: ...Instalation manual TopFix 200 IBC SOLAR AG Version 23 01 As of 01 2023...
Page 114: ...Version 23 01 As of 01 2023 Page 114 from 119...
Page 115: ...Version 23 01 As of 01 2023 Page 115 from 119...
Page 116: ...Version 23 01 As of 01 2023 Page 116 from 119...
Page 117: ...Version 23 01 As of 01 2023 Page 117 from 119...
Page 118: ...Version 23 01 As of 01 2023 Page 118 from 119...
Page 119: ......