
MAN-072
11
2.7- ELECTRICAL CONNECTIONS
(refer to the attached electrical scheme)
NOTE:
FOR A CORRECT INSTALLATION FOLLOW
THE UNDER SHOWN INSTRUCTIONS
.
INSERT BATTERY FIXING STRIPE IN THE
DEDICATED SLOTS
.
(SEE FIG. 17)
PLACE THE BATTERY SUPPORT CLAMPS ON
THE CHASSIS TUBE, FIX THEM THROUGH THE
SPECIFIC SCREWS ON THE SUPPORT PIPES
(SCREW TE M6x25
–
SEE FIG. 18). JUST
TIGHTEN A LITTLE TO KEEP THEM IN PLACE
ON THE CHASSIS.
(HEXAGONAL MALE KEY 5mm)
PLACE THE BATTERY SUPPORT, THE PUSH
BUTTONS BRACKET BETWEEN THE CLAMP
AND THE BATTERY SUPPORT, (SEE FIG. 19),
THEN TIGHTEN THE COMPONENTS WITH A
10mm SOCKET WRENCH.
AFTER TIGHTENING THE BATTERY SUPPORT
UPPER SCREW, COMPLETELY TIGHTEN ALSO
THE CLAMPS SCREWS.
(SOCKET WRENCH 10mm)
TROQUE THE SCREWS AT 8 ÷ 10 Nm
(ALLEN WRENCH 5mm)
TORQUE THE SCREWS AT 8 ÷ 10 Nm
(SEE FIG. 19 and 20)
THE BOX MUST BE FIXED WITH AT LEAST ONE
SCREW FOR EACH CLAMP.
FIX WITH MORE SCREWS DEPENDING ON
CHASSIS.
NOTE:
THE DIFFERENT HOLES ON THE BATTERY
SUPPORT AND ON THE BRACKET, ALLOW TO
ADAPT THE SYSTEM TO EVERY CHASSIS.
Fig.17
Fig.18
Fig.19
Fig.20