19
Step 4:
Repeat steps 2 & 3 to connect the other end of the interconnect cable to the left side upright. For
starter adder application continue to repeat the interconnect cable installation for as many uprights
as are going to be powered by a single power up cable.
Step 5:
At this point return to the appropriate worksurface installation instructions and install the
worksurfaces.
Step 6:
Once the worksurface has been installed the upright interconnect cable is looped up to the
underside of the worksurface and is attached using three
1” conduit clamps and wood screws
included in the hardware kits.
PLEASE NOTE:
It is very important that the upright interconnect cables are secured to the underside of the
worksurface to avoid damage or failure of the PDS-II system. There should be a gentle radius at
the ends of the interconnect cables as shown above.
NOTE: For adjustable height benches the upright interconnect cables are attached to the
workstation back panel, NOT the underside of the worksurface.