13
ITEM DESCRIPTION
QTY
4
D4 D/S Worksurface
2
5
D4 Hat Section
4
HARDWARE KIT HWR214
ITEM DESCRIPTION
QTY
D
Bolt 1/4-20 Hex Head Black
32
B
Washer 1/4 Flat Black
32
Note: At this point in the assembly of your benches it may be easier to install options such
as footrests, shelves, lights, parts cut stringers and electrical channels to the uprights
before the worksurfaces are installed.
If your order includes Heavy Duty Frames please see page 16 before proceeding. If your
order includes PDS-II please see page 18 before installing the worksurfaces.
Step: 7
Lay the worksurfaces upside down on a clean padded surface. Position the worksurface hat
sections over the threaded inserts in the front and middle portion of the worksurface and center
them left to right of the worksurface. Attach each hat section with 8 sets of Item # D and B.
Tighten hardware only when all bolts are started by hand. Do not tighten this hardware to more
than 10 foot lbs of torque. Do not over tighten. If this is an ESD worksurfaces attach the ESD
Coupler Nuts found in hardware kit HWR014. See page 85 for installation caution notes.
Note:
If your order includes 3”, 6” or 12” single drawers units you can assemble the drawer cases onto
the worksurface hat sections at this time. This makes the attachment of the drawer cases easier
but also makes the worksurfaces heavier and therefore more difficult to turn over and place into
position. Caution must be taken during this process to insure that assemblers are not injured
during and that the worksurfaces and the surrounding areas are not damaged. If you choose to
assembly the drawer cases to the worksurface at this time IAC Industries recommends that all
assemblers are wearing proper safety equipment. Refer to page 36 for drawer assembly
instructions.