Page 26
Step
Action
1
When making connections, consider the following:
•
DIN 1988
•
DIN EN 1717
•
DIN EN 806
•
Regulations of the responsible water supply company
2
Raw water supply
→
Raw water intake
Ensure that on the intake side no fittings, armatures etc. are installed
within an area of at least 20 cm. Use a hose to connect the raw water
supply and the raw water intake.
3
Concentrate hose
→
Waste water channel
Ensure free drain according to DIN EN 1717.
System preserved by manufacturer
4a
Permeate outlet
→
Waste water channel channel (for rinsing the
preservation solution)
4b
Permeate outlet
→
System to be filled
System not preserved or already rinsed out
5
Permeatausgang
→
System to be filled